Customization: | Available |
---|---|
Energy Type: | Electric |
Shell Material: | Alloy Aluminum |
Still deciding? Get samples of US$ 330/Piece
Order Sample
|
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Shell Material | IP Rating | Dual Projection | Hanging | Combination | Element Material | Tube Replacement |
Alloy Aluminum | IP65 | Yes | Ceiling Bracket Set Supported as Well | Support Endwise or Broadwise | Carbon Fiber Far-Infrared Only | Easy Connection No Need Licensed Eletrician |
Industrial Heater Cronus:Patented Dual projecting modes - focusing or diffusing set simply,Supporting combining broadwisely or endwisely for power from 3KW-18KW to cover bigger space - single unit heating distance more than 7 meters, Working with CA1 Dimmer Controller - control upto 6*3000W heaters precisely adjusting the output of heat in 6 increments for perfect comfort and complete flexibility with 1-4 hour timer.
Industrial infrared Heater -- Cronus
Suitable for Workshops, Dockyards, Stadiums and any Big lndoor or Open Areas
IP65 : Stand good for real industrial circumstances of Heavy Dust or Moisture.
Anti-corrosion materials: Extruded Aluminum shell with SS Brackets/Strings
Easy-replaced tube: Patent structure enables replacement without licensed electrician
Coverage: For model of 6000W, Heating area upto 55 m² when hung at 3-5M highWhen wall mounted at 3M high, effective heating distance upto 10M, covering area upto 40 m²
FAQ
What's your products' advantages?
1. High quality and Competitive Price 2. Fashionable and popular design
3. Environmental Material 4. Perfect Finish and craftsmanship
How to control the products quallty?
1. Check and confirm using the standard material before the bulk production.
2. Tracing all of the phase of production from the beginning to the end.
3. Check the quality again before packing.
4. Checked the packing before shipment.
Producing lime and Shipping Ways?
1. Normally 12-20 Days, depend on your order quantity.
2. Express courier like DHL, UPS, TNT. Needs 3-5 working days depends on country and area.
3. By air port to port: about 7-12 days depends on port.
What's your payment terms?
We accept T/T bank transfer,Paypal Western union and MoneyGram.