Customization: | Available |
---|---|
Energy Type: | Electric |
Element Material: | Carbon Fiber Far-Infrared Only |
Still deciding? Get samples of US$ 70/Piece
Order Sample
|
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Lighting | Shell Material | Element Material | IP Rating | Shell Temp |
3-Color LED Option | All in Aluminum Including Grille | Carbon FiberFar-Infrared Only | IP55 | <100° Friendly to Mounted Material |
Annular Eclipse Tech | Half-Side Projection | Mounting | Shell Finish | Storage Cover |
Yes, Heating You Not Drinks Beneath | Yes, Heating Without Loss | Support Pully & Side-Post Parasols | Brush Aluminum | Optional |
What's your products' advantages?
1. High quality and Competitive Price 2. Fashionable and popular design
3. Environmental Material 4. Perfect Finish and craftsmanship
How to control the products quallty?
1. Check and confirm using the standard material before the bulk production.
2. Tracing all of the phase of production from the beginning to the end.
3. Check the quality again before packing.
4. Checked the packing before shipment.
Producing lime and Shipping Ways?
1. Normally 12-20 Days, depend on your order quantity.
2. Express courier like DHL, UPS, TNT. Needs 3-5 working days depends on country and area.
3. By air port to port: about 7-12 days depends on port.
What's your payment terms?
We accept T/T bank transfer,Paypal.