Warmwatcher Commercial Outdoor Garage Pergola Patio Terrace Electric Garden Heater

US$115.00
2-649 Pieces
US$97.00
650-1,999 Pieces
US$90.00
2,000+ Pieces
Port:
Shunde, China
Production Capacity:
5K Pieces Per Month
Payment Terms:
L/C, T/T

Last Login Date:

Jun 18, 2025

Business Type:

Manufacturer/Factory, Trading Company

Main Products:

Outdoor Heater, Outdoor Electric Heater, Patio Heater, Patio Electric Heater

Find Similar Products

Product Description

Company Info

Basic Info.

Model NO.
UPH3000
Usage
Warm Oneself
Certification
CE, RoHS, CCC
Type
Heating Tube
Operating Principle
Far-Infrared
Material
Aluminium
IP Rating
IP55
Element Material
Carbon Fiber Far-Infrared Only
PIR Sensor
Yes
Timer
4 Hours
Intelligent Cut
Yes, Human & Safe
Snap-in Tube
Easy Replacement No Need Licensed Electrician
Shell Material
Alloy Aluminum
Shell Temp
<85° Friendly to Mounted Material
Hanging
Ceiling Bracket Included as Well
Shell Finish
Brush Aluminum
Trademark
Warmwatcher
Transport Package
Carton
Specification
220-240V 50/60Hz 900/1900/2800W
Origin
Guangdong, China
HS Code
8516292000

Product Description

 
IP RatingElement MaterialPIR SensorTimerIntelligent CutSnap-in TubeShell MaterialShell TempHangingShell Finish
IP55Carbon Fiber Far-Infrared OnlyYes4 HoursYes, Human & SafeEasy Replacement No Need Licensed ElectricianAlloy Aluminum<85° Friendly to Mounted MaterialCeiling Bracket Included as WellBrush Aluminum
 
Superiorities of the Product
  1. Friendly to mounting materials -Shell temp lower to 85oC,
  2. Patented Coupling structure for easy replacement of tube,
  3. Low glare
  4. Details by Video at Warmwatcher website. 
Key words of the Company
  1. One of the earliest firms since 2009 on her brand Warmwatcher;
  2. An ISO9001 & BSCI qualified manufacturer;
  3. Dedicates in electric heating for open or big space ONLY;
Product Description

FAQ

What's your products' advantages?
1. High quality and Competitive Price 2. Fashionable and popular design

3. Environmental Material 4. Perfect Finish and craftsmanship
 

 

How to control the products quallty?
1. Check and confirm using the standard material before the bulk production.

2. Tracing all of the phase of production from the beginning to the end.

3. Check the quality again before packing.

4. Checked the packing before shipment.

 

Producing lime and Shipping Ways?
1. Normally 12-20 Days, depend on your order quantity.

2. Express courier like DHL, UPS, TNT. Needs 3-5 working days depends on country and area.

3. By air port to port: about 7-12 days depends on port.

 

What's your payment terms?
We accept T/T bank transfer,Paypal.

Send your message to this supplier
Mr. Deng

Post a Sourcing Request Now

People who liked this also liked
Get Quick Quotes